Our jackleg cabins also form the basis of our modular range of buildings.
These units are built to order and are available typically within a 6-8 week lead time. With almost limitless optional extras these cabins can be turned into almost anything and options include:
– Standard and Disabled Toilets, Partitions and Serving Hatches, Fixed Seating, Drying Room Furniture, Dado Rail Trunking;
– Choice of doors – type and size – including steel anti-vandal
– Choice of windows – size, position, tint, opening type and blind
– Increased specification to building regs if required; Extra Electrical Equipment, Possibility to be joined to create modular buildings
– Tinted Windows, Blinds, Disabled Access, Disabled Toilets, CAT2 lighting, Exterior Lights, Pinboards, White Boards, Coat Hooks
– Exterior Cladding, PIR Lighting, Choice of External Colours
Jack Leg Cabin Floor Spec
150 x 50 floor joists
Eco brite floor insulation
18mm plywood flooring
Jack Leg Cabin Wall panel Spec
0.7mm Corus steel
40mm timber frame
40mm high density insulation
12.5mm vinyl plasterboard internal
Jack Leg Cabin Window Specs
UPVC double glazed windows
Jack Leg Cabin Roof Spec
170 x 50 roof joists
Marley roof decking
12mm plywood roofing
150mm roof insulation
12.5mm plasterboard ceiling
You can view our current Jack Leg Cabin stock here